CD1: Application Documents and Plans
1.1 - Application form (19/12/24) (PDF)
1.2 - Covering letter (RPS, 19/12/24) (PDF)
1.3 - Location plan (12/08/24) (P24-1200-DE_001 Rev E) (PDF, 3.4 MB) (PDF)
1.4 - Proposed Site Access Durrants Drive (17.12.2024) (T24544.001)
1.5 - Proposed Site Access Links Way (17.12.2024) (T24544.002)
1.7 - Education Report (EFM, December 2024) (PDF, 2.1 MB)
1.8 - Energy Statement (Greengage, December 2024) (PDF)
1.9 - Flood Risk Assessment (BWB, December 2024, 233574_FRA) (PDF, 19.7 MB)
1.10 - Health Impact Assessment (RPS, December 2024, 1.0) (PDF, 1.6 MB)
1.11 - Air Quality Assessment (BWB, December 2024, 233574-01-AQA) (PDF, 14.5 MB)
1.12 - Sustainable Drainage Strategy (BWB, December 2024, 233574-SDS) (PDF, 20.2 MB)
1.13 - Utilities Statement(BWB, December 2024, 233574) (PDF, 23.9 MB)
1.14 - Agricultural land classification and soil resources report (24/12/24) (PDF, 8.6 MB)
1.15 - Sustainable Drainage Strategy (BWB, December 2024, 233574-SDS) (PDF, 20.2 MB)
1.16 - Heritage Statement (Pegasus Group, December 2024, P24-1200) (PDF 6.5 MB)
1.17 - Landscape and Visual Impact Assessment (iceni, December 2024) (PDF, 19.6 MB)
1.18 - Noise Impact Assessment (BWB, December 2024, 233574_002) (PDF, 1.1 MB)
1.19 - Sports and Leisure Strategy (Sports Planning Consultants, December 2024) (PDF)
1.20 - Planning Statement (RPS, December 2024) (PDF, 1.4 MB)
1.21 - Phase 1 GEO-Environmental Assessment (BWB, December 2024, 233574) (PDF, 28.1 MB)
1.22 - Affordable Housing Statement (Tetlow King Planning, December 2024, M24/0511 01.RPT) (PDF)
1.23 - Biodiversity checklist (24/12/24) (PDF)
1.24 - Biodiversity Calculation Metric (24/12/24) (xls, 4.6 MB)
1.25 - Local Centre Capacity Statement (Lambert Smith Hampton, December 2024) (PDF)
1.26 - TRDC 5 Year Housing Land Supply Assessment (Emery Planning, December 2024, 24-305) (PDF)
1.27 - Statement of Community Involvement (Cratus Group, December 2024) (PDF, 6.1 MB)
1.28 - Sustainability Statement (Greengage, December 2024) (PDF)
1.29 Design and Access Statement and Design Code (19.12.2024)
1.30 Preliminary Arboricultural Impact Assessment (Tyler Grange, December 2024, 11702_R02_NC RevD)
1.31 Transport Assessment (hub, 16/12/2024) (PDF 60.3MB)
1.32 Travel Plan (hub, December 2024) (PDF14.2MB)
1.33 - HCC Highways Notice Letter (RPS, 16/01/2025) (PDF)
| Headless Content Management with Blaze
