Contact Details: M25 Widening

Formal notice was received in April 2010 from Skanska/Balfour Beatty for three balancing ponds and strip widening works in regard to the M25 widening scheme, details of which can be downloaded below.

downloadable document icon

downloadable document icon

downloadable document icon

downloadable document icon

downloadable document icon

Previous announcements

Formal notice was received from Skanska/Balfour Beatty for the construction of one permanent environmental mitigation bund alongside the M25 adjacent to Junction 20, and one permanent balancing pond to the north of the River Chess, near Chorleywood.

Skanska/Balfour Beatty consider that the works do not require planning permission as they are permitted development allowed by the Town and Country Planning (General Permitted Development) Order.

downloadable document icon

downloadable document icon

Previous announcements

See M25 Widening - Construction of Two Environtmental Mitigaton Bunds off Junction 17 (8 June 2009).

See update (13 February 2009) - M25 compound decision

The District Council has received formal notice from Skanska/Balfour Beatty of their intention to carry out works in the southeast quadrant of junction 17 of the M25 between Long Lane and the A412 link road (adjacent to the link road and the roundabout junction with Uxbridge Road – see location plan with notice).

The works will comprise a construction compound for the widening and maintenance of the adjacent stretch of the M25 and are expected to be in use from February 2009 until the end of 2011. The full notice may be downloaded below.

downloadable document icon

downloadable document icon

downloadable document icon

downloadable document icon

downloadable document icon

You can contact this department directly by telephone or email:

Telephone no:
01923 776611
Fax no:
01923 896119
Email:
peter.kerr@threerivers.gov.uk

Address:
Three Rivers House
Northway
Rickmansworth
Herts
WD3 1RL